Loading descriptions...
Work begins on the internal geothermal systems. Exterior in-wall lighting is installed.
Work begins on the internal geothermal systems. In-wall lighting is installed to illuminate the entrance ramp. An offset p-trap is installed for accessibility. A glass blowing studio is visited. Back at the house, grab bar installation begins.