Loading descriptions...
Work continues on the geothermal system. Blocking is installed, and old receptacles are replaced.
The fully framed front of the house is revealed. Work continues on the geothermal system, and the connection to the interior is made. Blocking is installed in the framing. Old receptacle boxes in the original brick walls are replaced and rewired.